Project: Geek   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Gary Phenning   -  
Project:   Kitfox - Series 7   -   VIEW REPORTS
Total Hours:1393.7
Total Flight Time:0.4
Start/Last Date:Mar 06, 2021 - Apr 06, 2024
Engine:Rotax 912is
Propeller:Whirlwind
Panel:Garmin G3x
 
Friendly URL: https://eaabuilderslog.org?s=Geek

Home or Last Project Picture

Oct 15, 2021     Horiz Stab and Rudder - (8 hours)       Category: Empennage
Worked on mounting the horizontal stab and the rudder today. Got the stab on the fuselage, attached the supports but haven't done the adjusting to verify the horizontal is perpendicular to the vertical stab. Fitted and drilled the front slide blocks. Attached the rudder and adjusted the attachment points so that the proper gap clearances of 1 1/2 inches on the top and 2 5/16 inches at the bottom between the rudder and the vertical stab. Most definitely had to run a tap through the threaded attachment points on the vertical stab to get the bearings to thread in far enough to set the proper gap.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.